A construction-to-permanent loan is built for a house that does not exist yet, or that exists only as a foundation and a set of plans. The lender approves you and the project up front. During the build, the builder is paid in draws after inspections confirm that the listed work was done. When the house is finished and the certificate of occupancy is in hand, the same loan converts into the long-term mortgage you will live with, without a second full application if you used a true one-time close.
That is a different product from a renovation loan, which begins with a house that already has walls and a defined repair list. It is also different from paying cash for a lot and later shopping a purchase loan, which is two separate files and two sets of closing costs. Families building in Marvin, Weddington, along Lake Norman or on larger lots at the rural edge of the metro use construction-to-permanent financing because the finished price often sits well above what a simple resale pre-approval was written to cover.
We work from suite 1933 at 128 South Tryon Street (Company NMLS 2468711). Not every wholesale desk offers construction-to-permanent financing, and the desks that do write their own rules about builders, plans, contingencies and how land already owned is treated. Comparing those desks is the job; copying a blog diagram of “how construction loans work” is not.
One closing or two, and why the distinction matters here
A one-time-close construction-to-permanent loan uses a single underwrite and a single closing for the build and the long-term mortgage. When the house is finished, the loan converts. You avoid a second application, a second set of most closing costs and the risk that rates or credit have moved against you during the build. A two-time-close structure uses a construction loan first and a separate permanent loan later. That can be the right tool when the only construction lender available is not the lender you want to live with, but it means two closings and two chances for the file to change.
Around Charlotte, one-time close is what most custom-home buyers ask for first, especially when the finished price will be jumbo or close to it. Two-time close shows up more often when a builder has a preferred construction lender and you plan to refinance elsewhere at completion. We will not pretend one shape is always cheaper. We will show you the costs of each on your numbers, including what happens if the build runs long and the rate you were counting on is no longer available.
Land you already own can usually be counted as part of your equity in the project. Land you are buying can often be folded into the same loan, subject to the investor’s rules about how that land is valued and how long you have held it. A lot purchased last month and a lot that has been in the family for twenty years do not underwrite identically. Bring the deed or the purchase contract for the land with the plans.
Builder approval, plans and the local places people actually build
Investors approve builders as well as borrowers. A custom builder who has delivered houses in Union County or along the lake for a decade is an easier conversation than a first-time general contractor, not because new builders cannot do good work, but because the lender wants evidence the project will finish. Plans, specifications, a budget, a timeline and a builder’s contract all belong in the file before anyone calls the first inspection. Changes after approval have to be documented; a kitchen upgrade decided in month six is not a handshake item.
Marvin, Weddington and parts of Waxhaw produce many of the larger custom builds we see, often at prices that make the finished loan jumbo. Lake Norman lots in Cornelius, Davidson and on the Iredell shore produce houses whose finished values are driven as much by the water as by the floor plan. North Mecklenburg and the far south end of the county still have pockets where a custom house can go up on a remaining lot. Inside the older city grid, construction-to-permanent files are less common and more often involve tearing down an existing house, which adds demolition, permitting and neighbor-notice steps the lender does not control.
Permits come from the county or town that has jurisdiction, which may not be the City of Charlotte even when your mailing address sounds like Charlotte. Union County, Iredell County and the lake towns each have their own inspection sequence. We do not pull those permits for you, but we do need them to stay in step with the draw schedule, because an inspector cannot sign off on a draw for work the jurisdiction has not approved.
Which programs can be used to build, and which costs sit beside the hard hat
Depending on the lender and your situation, construction-to-permanent financing is available in conventional, FHA, VA and USDA versions, and in jumbo form for larger custom homes. FHA and VA construction paths are less widely offered than conventional ones and come with additional property and builder conditions. USDA construction requires an eligible lot on the current map, which, as the USDA-near-Charlotte page explains, almost never includes the city core. Jumbo construction is common in Marvin, Weddington and on the lake; the finished note has to be classified against FHFA’s 2026 baseline of $832,750 the same way a purchase would be.
Beyond the construction contract itself, plan for interest during the build, which is usually charged on the amount drawn so far rather than on the full commitment; for a contingency reserve that covers surprises in the ground or in material prices; for extended builder’s risk or dwelling coverage while the house is unfinished; and for the taxes on the land, which continue during construction and then change when the finished house is added to the card. We will not invent a percentage for any of those lines. We will ask the builder and the investor for the figures that apply to your contract.
Timelines for custom homes in this market are measured in many months, not in the 30-day window of a resale. Weather, inspections, material lead times and change orders all stretch calendars. A construction loan that expires before the certificate of occupancy is issued is an expensive problem. We talk about a realistic completion date, and about what the investor allows if that date moves, before you break ground rather than after the second delay.
How we run a construction file from this office
Bring the lot information or the land contract, the builder’s name, the plans or a detailed spec sheet, and a budget. We find out which desks will finance that combination, classify the finished loan as conforming or jumbo, and compare the one-time-close findings that actually fit. If a two-time-close structure is the only way to use a builder’s preferred construction lender, we will say so and show what a later permanent loan would involve.
You pick the closing attorney. Draws after closing are inspected. Your job during the build is to stay in communication when something changes: a delayed window shipment, a foundation surprise, a desire to add a screen porch. Silence is what turns a manageable change order into a file the investor no longer recognizes. When the house is complete, the conversion to the permanent mortgage follows the investor’s checklist, including a final inspection and, in many files, a final appraisal or completion report.
If you are deciding between buying a finished spec home in Ballantyne and building on a lot in Marvin, we can price both shapes. They are not the same monthly number, they are not the same calendar and they are not the same risk. The right answer depends on how long you can live wherever you are living now, how attached you are to a particular floor plan and how comfortable you are with a project that does not yet have walls.
Where you live while the house goes up
Most construction-to-permanent borrowers in this metro keep living in a current house, a rental or a short-term arrangement until the certificate of occupancy is issued. The lender will want a clear story about that, because the new house cannot be occupied as a finished primary residence until it legally is one. If you plan to sell your current home to help fund the build, the timing of that sale against the draw schedule becomes part of the file. Selling too early without a place to land, or counting on a sale that has not happened, are two of the more stressful ways to fund a custom house.
Some households keep the current mortgage in place and carry both the construction interest and the existing payment for a stretch. That has to be qualified honestly. Others time a sale to coincide with conversion, using proceeds to reduce the permanent balance. There is no single right sequence. There is only the sequence that matches your cash, your family and the builder’s calendar, written down so the investor can see it.
What clients who built with financing from us have posted
Households who used a construction file with us left these comments on Google. The widget shows that public profile.
Sources and limits for this construction page
Construction-to-permanent structures (one-time close versus two-time close, draws after inspection, conversion at completion) are investor-specific. We describe how those files are typically assembled without publishing a rate, a draw percentage or a reserve rule that would pretend every desk agrees. Program availability in conventional, FHA, VA, USDA and jumbo form depends on the lender; USDA lot eligibility follows the official USDA map discussed on our USDA-near-Charlotte page. The $832,750 finished-loan line mentioned above is FHFA’s 2026 baseline. FHFA and the agencies named here do not run this brokerage.